Olde Town Pedestrian Mall
Arvada, Colorado
StudioCPG collaborated with the City of Arvada to transform three blocks of the Olde Town district into a vibrant and inviting Pedestrian Mall.
1) Understand historical site characteristics and development patterns
2) Analyze and illustrate the impacts of proposed changes on existing use patterns
3) Integrate this understanding with urban planning and engineering requirements
Arvada, Colorado
StudioCPG collaborated with the City of Arvada to transform three blocks of the Olde Town district into a vibrant and inviting Pedestrian Mall.
Denver, Colorado
The removal of the 13th Street pedestrian bridge connecting the Denver Center for the Performing Arts with its main parking structure opened possibilities to tie the urban fabric together at street level
Denver, Colorado
Morrison Road Streetscape Implementation Plan is a preliminary design tool generated by StudioCPG and developed ...
Denver, Colorado
StudioCPG provided planning and landscape architectural design services for street reconstruction and streetscape improvements along Tennyson Street between 38th Avenue and 44th Avenue in northwest Denver.
Denver, Colorado
Cherry Creek South Drive runs along the iconic Denver waterway and is included in the Cherry Creek Greenway Corridor Master Plan.f