Facebook Instagram LinkedIn Call: (303) 455-3779 Our Work

13th Street and Champa Reconstruction

The removal of the 13th Street pedestrian bridge connecting the Denver Center for the Performing Arts with its main parking structure opened possibilities to tie the urban fabric together at street level. StudioCPG worked with traffic engineers and architects to create a safe and gracious connection through what had been the back door of several auditoriums. The area functions as an alley, with theater loading and trash service coexisting with what is now a main pedestrian connection to the theaters and an active plaza. Improvements include a refined paving pattern, site furnishings, plantings and pedestrian lighting. Our work also included a series of illustrative perspectives to communicate project expectations.

View More of This Project

Use the slideshow below to get a better look at the project.

View More Projects

More Urban Design Projects below:

OLDE TOWN PEDESTRIAN MALL

Arvada, Colorado

StudioCPG collaborated with the City of Arvada to transform three blocks of the Olde Town district into a vibrant and inviting Pedestrian Mall.

Read More
Morrison Road Streetscape Implementation Plan

Denver, Colorado

Morrison Road Streetscape Implementation Plan is a preliminary design tool generated by StudioCPG and developed ...

Read More
Tennyson Street Improvements

Denver, Colorado

StudioCPG provided planning and landscape architectural design services for street reconstruction and streetscape improvements along Tennyson Street between 38th Avenue and 44th Avenue in northwest Denver.

Read More
CHERRY CREEK SOUTH DRIVE

Denver, Colorado

Cherry Creek South Drive runs along the iconic Denver waterway and is included in the Cherry Creek Greenway Corridor Master Plan.

Read More