Facebook Instagram LinkedIn Call: (303) 455-3779 Our Work

La Lomita Park Redesign

Denver, Colorado

About the Project:

Water Quality

Redevelopment of the flood control function at La Lomita Park, formerly Asbury Tejon Park, will improve regional water quality and expand local recreation opportunities at the park. StudioCPG developed site grading and drainage concepts that incorporate Water Quality Best Management Practices (BMP’s) into what had been a simple, peak reduction flood control facility.

Traditional Playground & Nature Play

The new playground incorporates Nature Play concepts into the design and serves a wider range of ages than present day facilities. The playground design balances traditional playground equipment with Nature Play elements including logs, rocks, boulders, water, trees and plantings that create likable features that engage the water directly.

VIEW MORE OF THIS PROJECT

Use the slideshow below to get a better look at the project.

View More Projects

More Parks, Trails, and Open Space projects below:

Blue Grass Conversion

Denver, Colorado

StudioCPG developed a protocol for Denver Parks converting bluegrass to alternative turf and cover types.

Read More
Playground Upgrades

Denver Parks
Denver, Colorado

StudioCPG was contracted to provide upgrades to play equipment and site drainage at two existing park playgrounds

Read More
Mestizo Curtis Park Master Plan

Denver, CO

StudioCPG worked with a multi-disciplinary group to create an updated Master plan and Phase 1 construction documents for the historic Mestizo Curtis Park located north of Downtown Denver.

Read More
Northern Shores Playground

Denver Zoo
Denver, Colorado

StudioCPG designed a new playground as part of the redevelopment of the Northern Shores exhibit/concession area at the Denver Zoo.

Read More